KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      FRIDAY, MAY 15, 1998 (1:44 PM EDT)

      KSC Public Affairs Contact: Joel Wells (fax: 407-867-2692)

      Launch Viewing Information


      MISSION: STS-91 -- 9TH AND FINAL MIR DOCKING, SPACEHAB-SM, Alpha Magnetic Spectrometer (AMS)

      STS-91 images

      • VEHICLE: Discovery/OV-103
      • LOCATION: Launch Pad 39A
      • TARGET KSC LAUNCH DATE/TIME: June 2 at about 6:10 p.m. EDT
      • LAUNCH WINDOW: 7-10 minutes
      • MIR DOCKING DATE/TIME: June 4 at about 12:59 p.m. EDT
      • MIR UNDOCKING DATE/TIME: June 8 at about 12:01 p.m. EDT
      • TARGET KSC LANDING DATE/TIME: June 12 at about 2:03 p.m. EDT
      • MISSION DURATION: about 9 days, 19 hours, 53 minutes
      • CREW: Precourt, Gorie, Lawrence, Chang-Diaz, Kavandi, Ryumin, Thomas (down)
      • ORBITAL ALTITUDE and INCLINATION: 173 nautical miles/51.6 degrees

      NOTE: Retests of Discovery's replaced master event controller and multiplexer/demultiplexer were successfully completed yesterday. Aft compartment close-outs continue in preparation for testing of the first super lightweight external tank. Liquid hydrogen loading is slated to begin Monday at about 7 a.m. and liquid oxygen loading follows at 10:20 a.m. SPACEHAB interface verification testing is complete and the AMS IVT is scheduled to begin this afternoon. Following the AMS IVT, Discovery's payload bay doors will be closed. The Rotating Service Structure will be retracted on Sunday in preparation for the tanking test.

      STS-91 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • AMS interface verification test (May 15)
      • Tanking test of first super lightweight external tank (May 18)
      • Flight Readiness Review (May 19)

      MISSION: STS-88 -- FIRST FLIGHT INTERNATIONAL SPACE STATION
      NODE-1 (Unity)

      STS-88 images

      • VEHICLE: Endeavour/OV-105
      • LOCATION: OPF bay 1
      • TARGET KSC LAUNCH DATE/TIME: No earlier than Sept. 3 (under review)
      • MISSION DURATION: 10 days, 19 hours, 18 minutes
      • CREW: Cabana, Sturckow, Currie, Ross, Newman
      • ORBITAL ALTITUDE and INCLINATION: 173 nautical miles/51.6 degrees

      NOTE: Endeavour's radiators are stowed in the orbiter's midbody and the payload bay doors have been closed to support inspections. Hydraulic leak checks of the main landing gear struts are in work.


      MISSION: STS-93 -- Advanced X-ray Astrophysics Facility (AXAF)

      STS-93 images

      • VEHICLE: Columbia/OV-102
      • LOCATION: OPF bay 3
      • TARGET KSC LAUNCH DATE/TIME: no earlier than Dec. 3 at 2:50 p.m.
      • TARGET KSC LANDING DATE/TIME: Dec. 8 at 1:57 p.m.
      • LAUNCH WINDOW: 43 minutes
      • MISSION DURATION: 4 days, 23 hours, 7 minutes
      • CREW: Collins, Ashby, Hawley, Coleman, Tognini
      • ORBITAL ALTITUDE and INCLINATION: 153 nautical miles/28.45 degrees

      NOTE: Preparations for Columbia's hypergolic deservicing are complete. Removal of the Spacelab tunnel forward extension is also complete. Draining of the orbiter maneuvering system propellant tanks is under way.

      STS-93 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Main engine heat shield removal (May 20)
      • Shuttle main engine removal (May 21)

      --end--

      For automatic e-mail subscriptions to this daily Shuttle status report or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

      To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."

      Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/