![]() TUESDAY, MAY 26, 1998 (1:35 PM EDT) STS-91 -- 9TH AND FINAL MIR DOCKING, SPACEHAB-SM, Alpha Magnetic Spectrometer (AMS)
NOTE: Discovery's main engine leak checks are complete and orbiter aft compartment close-outs are in work. Installation of the external tank separation camera is also complete. End-to-end testing of the AMS payload concluded Saturday and payload bay door closure is slated to occur today. At pad 39A, preparations are under way for ordnance installation early tomorrow morning. Tomorrow afternoon, technicians will partially drain and then refill the orbiter maneuvering system oxidizer tank to ensure proper loading and pressurization. Launch countdown preparations begin this week with the 43-hour countdown clock scheduled to start Saturday at 9 p.m. The STS-91 flight crew arrives at KSC Saturday at 12:30 p.m. STS-91 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-88 -- FIRST FLIGHT INTERNATIONAL SPACE STATIONUNITY (Node-1)
NOTE: Flushing of Endeavour's ammonia boiler system was completed Friday. Preparations are in work today to support forward reaction control system installation on Wednesday. Auxiliary power unit leak and functional testing is under way. In the VAB, solid rocket booster joint close-outs continue and external tank/solid rocket booster mate is slated for the first week in June. STS-93 -- Advanced X-ray Astrophysics Facility (AXAF)
NOTE: Mechanical connections of Columbia's replaced fuel cell No. 2 are complete. Efforts to remove the extended duration orbiter (EDO) pallet continue through next week. Orbiter maneuvering system functional testing is in work. Main propulsion system inspections are under way and water spray boiler No. 3 off-load is in progress. This week technicians will replace the nose landing gear wheels and tires. STS-93 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
For automatic e-mail subscriptions to this daily Shuttle status report or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription. To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release." Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/ |