![]() THURSDAY, MAY 28, 1998 (4:49 PM EDT) STS-91 -- 9TH AND FINAL MIR DOCKING, SPACEHAB-SM, Alpha Magnetic Spectrometer (AMS)
NOTE: Preparations to begin the launch countdown for mission STS-91 on Saturday are proceeding on schedule. Installation and checkout of the ordnance on the solid rocket boosters are complete. Refilling of Discovery's orbiter maneuvering system oxidizer tank concluded yesterday and pressurization of the hypergolic system began this morning. Aft main engine compartment close-outs have resumed today and will conclude Saturday with aft door installation. The STS-91 flight crew arrives at KSC Saturday at 12:30 p.m. STS-91 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-88 -- FIRST FLIGHT INTERNATIONAL SPACE STATIONUNITY (Node-1)
NOTE: Installation of Endeavour's forward reaction control system is in work and interface checks are scheduled for tomorrow. Auxiliary power unit leak and functional testing continues this week. In the Vehicle Assembly Building, solid rocket booster joint close-outs continue. STS-93 -- Advanced X-ray Astrophysics Facility (AXAF)
NOTE: Replacement of Columbia's nose landing gear wheels and tires is complete. Technicians continue preparations for tomorrow's planned removal of the extended duration orbiter (EDO) pallet. Orbiter maneuvering system functional testing also continues. Main propulsion system inspections are under way and water spray boiler No. 3 core off-load continues. STS-93 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
For automatic e-mail subscriptions to this daily Shuttle status report or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription. To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release." Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/ |