STS-96 -- 2nd U.S. INTERNATIONAL SPACE STATION FLIGHTNOTE: Shuttle orbiter Discovery rolled from Orbiter Processing Facility bay 1 to the Vehicle Assembly Building today at about noon. Tonight, the vehicle will be lifted into VAB high bay 3 and then soft mated to the STS-96 external tank and solid rocket booster stack. Following final electrical and mechanical connections, Shuttle interface testing is scheduled for April 19. Discovery is targeted for rollout to the launch pad on April 21.
At the pad, technicians will remove the two integrated electronic assembly (IEA) boxes from both solid rocket boosters. One IEA is in the forward assembly and one is in the aft assembly. The IEAs receive and execute SRB separation and range safety commands. Inside each IEA is a multiplexer demultiplexer that houses a printed circuit card. Recent tests have revealed that these cards may develop electrical shorts due to normal flight operations. As a precaution, Shuttle managers have decided to replace the suspect components in parallel with standard prelaunch work at the pad. No impact to the May 20 target launch date is expected.
STS-96 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-93 -- Chandra X-ray Observatory (formerly AXAF)
NOTE: Shortly after noon today, Columbia arrived at OPF bay 1 having completed its temporary storage period in VAB high bay 2. Orbiter processing for mission STS-93 will resume following routine receiving inspections.
STS-99 -- SHUTTLE RADAR TOPOGRAPHY MISSION (SRTM)NOTE: Checks on Endeavour's orbital maneuvering system continue. Servicing of freon coolant loop No. 1 is complete and preparations to service loop No. 2 are in work. This week, workers will install the orbiter docking system harness.
STS-101 -- 3rd INTERNATIONAL SPACE STATION FLIGHTNOTE: Following replacement of the strut attach bolt for Atlantis' power reactant storage and distribution system, leak checks of oxygen tanks are now complete. Payload bay liner retainer modifications are under way and main propulsion system testing continues this week.
For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/