KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      WEDNESDAY, DECEMBER 8, 1999 (4:00 PM EST)

      MISSION: STS-103 -- 3rd HUBBLE SPACE TELESCOPE SERVICING MISSION

      • VEHICLE: Discovery/OV-103
      • LOCATION: Pad 39B
      • TARGET KSC LAUNCH DATE/TIME: December 11 at 11:42 p.m. EST (under review)
      • TARGET KSC LANDING DATE/TIME: December 21 at about 8:50 p.m. EST
      • LAUNCH WINDOW: 42 minutes
      • MISSION DURATION: about 9 days and 21 hours
      • CREW: Brown, Kelly, Smith, Foale, Grunsfeld, Nicollier, Clervoy
      • ORBITAL ALTITUDE and INCLINATION: 317 nautical miles/28.45 degrees

      Work in progress: Shuttle managers have decided to delay the start of the STS-103 launch countdown by at least 24 hours while engineers evaluate a dented main propulsion system hydrogen line found during closeout inspections of Discovery's engine compartment. A final decision on whether or not the line must be replaced is expected tomorrow. If the line requires replacement, it is anticipated that the work would postpone launch by a minimum of several days. The four-inch diameter line carries liquid hydrogen fuel for the Space Shuttle main engines.

      --end--

      For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.


      Author: Joel Wells / NASA Public Affairs
      Curator: Kay Grinter (Kay.Grinter@jbosc.ksc.nasa.gov) / InDyne, Inc.

      Previous Report | Status Reports | News | Media Resources | Next Report