STS-93 -- Chandra X-ray Observatory (formerly AXAF)
NOTE: Columbia's payload bay doors were opened earlier this week following the holiday down period. Also this week, workers replaced a transducer for orbiter freon coolant loop No. 2 and testing of the new component is complete. Columbia's forward and midbody compartment closeouts are in work. Potable water sampling is in progress. In the Vehicle Assembly Building, external tank and solid rocket booster closeouts continue.
STS-93 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-96 -- 2nd U.S. INTERNATIONAL SPACE STATION FLIGHTNOTE: Processing of the orbiter Discovery has resumed following the holiday down period. Functional testing of the orbiter's purge vent drain system is complete. A corrosion control modification on the base heat shield is in progress and main propulsion system leak and functional testing is under way. Technicians are preparing for upcoming radiator functional tests. Replacement of Discovery's window No. 1 continues and window No. 7 replacement begins later this week.
STS-101 -- 3rd INTERNATIONAL SPACE STATION FLIGHTNOTE: Atlantis remains in VAB high bay 2 awaiting Columbia's move to the VAB in early February. Workers are preparing for the installation of Atlantis' onboard tactical air command and navigation system (TACAN). OPF bay 3 will undergo planned open bay work for one week following Columbia's departure and will then house Atlantis throughout the STS-101 processing flow
STS-99 -- SHUTTLE RADAR TOPOGRAPHY MISSION (SRTM)NOTE: Endeavour's orbiter maneuvering system functional tests are in work. Shuttle main engine inspections continue and post flight servicing of the onboard waste management system is in progress.
For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/