KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      THURSDAY, JULY 22, 1999 (4:12 AM EDT)
      LAUNCH SCRUB

      MISSION: STS-93 -- Chandra X-ray Observatory

      STS-93 images

      • VEHICLE: Columbia/OV-102
      • LOCATION: Launch Pad 39B
      • TARGET KSC LAUNCH DATE/TIME: July 23, 1999 at 12:24 a.m. EDT
      • TARGET KSC LANDING DATE/TIME: July 27, 1999 at 11:20 p.m. EDT
      • LAUNCH WINDOW: 46 minutes
      • MISSION DURATION: 4 days, 23 hours
      • CREW: Collins, Ashby, Hawley, Coleman, Tognini
      • ORBITAL ALTITUDE and INCLINATION: 153 nautical miles/28.45 degrees

      NOTE: Launch managers postponed the launch of Space Shuttle Columbia today for 24 hours due to unacceptable local weather conditions. No significant technical issues were worked during the countdown and all Shuttle and payload systems remain in excellent health.

      The KSC launch team is executing a 24-hour scrub turnaround that will have Columbia and Chandra in a posture to launch at 12:24 a.m. Friday. Shuttle managers will convene at noon today to finalize the launch window for tomorrow's launch attempt.

      Weather officials are currently indicating a 30 percent probability that weather could prohibit launch on Friday. The primary threats are thunderstorms, rain showers and anvil clouds.

      --end--

      For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

      To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."

      Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/


      Author: Joel Wells / NASA Public Affairs
      Curator: Kay Grinter (kay.grinter-1@ksc.nasa.gov) / Information Dynamics, Inc.

      Go to the Previous Space Shuttle Status Report
      Go to the Next Space Shuttle Status Report

      Go to the Status Reports Home Page