STS-96 -- 2nd U.S. INTERNATIONAL SPACE STATION FLIGHT - SPACEHAB DOUBLE MODULENOTE: Following Discovery's successful undocking from the International Space Station yesterday, the flight crew will today begin preparations for the seventeenth consecutive KSC Shuttle landing early Sunday morning. Discovery has two landing opportunities at KSC on Sunday. The first opportunity requires a 12:54 a.m. deorbit burn and touchdown on Runway 15 at 2:03 a.m. The second opportunity calls for a deorbit burn at 2:30 a.m. and touchdown at 3:38 a.m. Edward Air Force Base will not be called to support as an alternate landing site on Sunday.
Weather officials expect generally favorable weather for a Shuttle landing at KSC on Sunday. Preliminary reports call for scattered clouds at 3,000 feet and 10,000 feet and broken at 20,000 feet; visibility at 7 miles; easterly winds at 6 knots peaking to 12 knots; temperature at 75 degrees F; humidity at 91 percent and the chance of showers within 30 nautical miles of the runway. Forecasters continue to monitor the development of a surface low over the Bahamas and its impact on landing day weather conditions.
STS-93 -- Chandra X-ray Observatory (formerly AXAF)
NOTE: Columbia is hardmated to the external tank and solid rocket booster stack in VAB high bay 1 today. Tomorrow, the Shuttle Interface Test will conclude and over the weekend workers will prepare for Monday's Shuttle roll out to Launch Pad 39B.
The Chandra X-ray Observatory and Inertial Upper Stage are undergoing interface verification testing today.
STS-93 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-99 -- SHUTTLE RADAR TOPOGRAPHY MISSION (SRTM)NOTE: Modifications to the main engine dome heat shields continue. Wireless video installation efforts proceed on schedule. Modifications to the freon coolant loop No. 2 isolation valve are in work. Tests on the power reactant storage and distribution system are in progress. Installation of Endeavour's right hand orbital maneuvering system pod begins early tomorrow and Shuttle main engine installation begins Monday.
STS-101 -- 3rd INTERNATIONAL SPACE STATION FLIGHT - SPACEHAB DOUBLE MODULE/ICCNOTE: Atlantis' wireless video modifications continue. Mass spectrometer leak checks on the orbiter's fuel cell power plant continue. Ammonia system leak and functional testing is scheduled this week.
For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/