STS-93 -- Chandra X-ray Observatory
NOTE: Launch pad validations are complete at Pad 39B. Columbia's auxiliary power units (APU) No. 1 and No. 3 have completed hotfire testing and APU No. 2 will follow next week. Main engine flight readiness testing concluded yesterday. Planned cycling of the orbiter's payload bay doors also concluded yesterday. Preparations are in work for the Helium Signature Test scheduled through tomorrow. Columbia's hypergolic loading begins Monday.
The Chandra/IUS combination will be placed into the transportation canister on June 18. The payload will be moved to the launch pad on June 19 and installed inside Columbia's cargo bay on June 24.
STS-93 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-99 -- SHUTTLE RADAR TOPOGRAPHY MISSION (SRTM)NOTE: Installation of Endeavour's main engine No. 1 is complete and installation of engines No. 2 and No. 3 continue this week. Modifications to the main engine dome heat shields continue. Wireless video installation efforts continue on schedule. Modifications to the final section of line on freon coolant loop No. 2 are in work.
STS-103 -- 3rd HUBBLE SPACE TELESCOPE SERVICING MISSION (HST-3)NOTE: Workers have completed orbiter access installation and the payload bay doors were opened yesterday. Preparations are in work for Monday's scheduled payload removal. Preparations are also under way for Discovery's hypergolic deservicing set to begin next week. Routine post-flight inspections of the orbiter continue.
STS-101 -- 3rd INTERNATIONAL SPACE STATION FLIGHT - SPACEHAB DOUBLE MODULE/ICCNOTE: Leak and functional testing of Atlantis' ammonia system is complete. Wireless video modifications continue. Mass spectrometer leak checks on the orbiter's fuel cell power plant continue. UHF system checks are under way.
For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/