KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      MONDAY, JUNE 14, 1999 (4:37 PM EDT)

      MISSION: STS-93 -- Chandra X-ray Observatory

      STS-93 images

      • VEHICLE: Columbia/OV-102
      • LOCATION: Launch Pad 39B
      • TARGET KSC LAUNCH DATE/TIME: No earlier than July 20, 1999 at 12:36 a.m. EDT (under review)
      • TARGET KSC LANDING DATE/TIME: July 24, 1999 at 11:31 p.m. EDT
      • LAUNCH WINDOW: 46 minutes
      • MISSION DURATION: 4 days, 23 hours
      • CREW: Collins, Ashby, Hawley, Coleman, Tognini
      • ORBITAL ALTITUDE and INCLINATION: 153 nautical miles/28.45 degrees

      NOTE: Columbia's Helium Signature Test and hypergolic system pressurization are complete. Prelaunch propellant loading is in work today. The orbiter's payload bay has been cleaned and preparations are in work at the pad to support the Chandra payload arrival. Columbia's payload bay doors will be reopened on Wednesday.

      The Chandra/IUS combination will be placed into the transportation canister on June 18. The payload will be moved to the launch pad on June 19 and installed inside Columbia's cargo bay on June 24.

      STS-93 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Workers observe Safety and Health Day (June 17)
      • Chandra payload transferred to Pad 39B (June 19)
      • Payload installed inside cargo bay (June 24)
      • Terminal Countdown Demonstration Test complete (June 24)

      MISSION: STS-99 -- SHUTTLE RADAR TOPOGRAPHY MISSION (SRTM)

      • VEHICLE: Endeavour/OV-105
      • LOCATION: OPF bay 2
      • TARGET KSC LAUNCH DATE/TIME: Sept. 16, 1999 at 8:47 a.m. EDT
      • TARGET KSC LANDING DATE/TIME: Sept. 27, 1999 at 12:52 p.m. EDT
      • LAUNCH WINDOW: 2 hours and 30 minutes
      • MISSION DURATION: 11 days, 4 hours and 5 minutes
      • CREW: Kregel, Gorie, Kavandi, Voss, Mohri, Thiele
      • ORBITAL ALTITUDE and INCLINATION: 126 nautical miles/57 degrees

      NOTE: Installation of Endeavour's three main engines and modifications to the dome heat shields are complete. Modifications to the final section of line on freon coolant loop No. 2 continue. Interface verification testing on the right-hand orbiter maneuvering system pod is in work. Installation of onboard floodlights is in work as well.


      MISSION: STS-103 -- 3rd HUBBLE SPACE TELESCOPE SERVICING MISSION (HST-3)

      • VEHICLE: Discovery/OV-103
      • LOCATION: OPF bay 1
      • TARGET KSC LAUNCH DATE/TIME: Oct. 14, 1999 at 5:42 a.m. EDT
      • TARGET KSC LANDING DATE/TIME: Oct. 23, 1999 at 3:09 a.m. EDT
      • LAUNCH WINDOW: 42 minutes
      • MISSION DURATION: 9 days, 21 hours and 38 minutes
      • CREW: Brown, Kelly, Smith, Foale, Grunsfeld, Nicollier, Clervoy
      • ORBITAL ALTITUDE and INCLINATION: 317 nautical miles/28.45 degrees

      NOTE: Removal of Discovery's STS-96 return payload is under way. Checks of the forward reaction control system are ongoing. Later today, workers will begin hypergolic tank valve draining. Routine orbiter receiving inspections continue.


      MISSION: STS-101 -- 3rd INTERNATIONAL SPACE STATION FLIGHT - SPACEHAB DOUBLE MODULE/ICC

      • VEHICLE: Atlantis/OV-104
      • LOCATION: OPF bay 3
      • TARGET KSC LAUNCH DATE/TIME: December 2, 1999
      • TARGET KSC LANDING DATE/TIME: December 13, 1999
      • LAUNCH WINDOW: 5-10 minutes
      • MISSION DURATION: 10 days and 19 hours
      • CREW: Halsell, Horowitz, Weber, Lu, Williams, Malenchenko, Morukov
      • ORBITAL ALTITUDE and INCLINATION: 173 nautical miles/51.6 degrees

      NOTE: UHF system checks are complete. Wireless video modifications continue. Mass spectrometer leak checks on the orbiter's fuel cell power plant continue.

      --end--

      For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

      To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."

      Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/


      Author: Joel Wells / NASA Public Affairs
      Curator: Kay Grinter (kay.grinter-1@ksc.nasa.gov) / Information Dynamics, Inc.

      Go to the Previous Space Shuttle Status Report
      Go to the Next Space Shuttle Status Report

      Go to the Status Reports Home Page