STS-96 -- 2nd U.S. INTERNATIONAL SPACE STATION FLIGHT - SPACEHAB DOUBLE MODULENOTE: The SPACEHAB tunnel has been mated to Discovery inside the payload bay and leak checks are complete. The orbiter’s prelaunch propellant loading began yesterday and will continue through Saturday. Tomorrow, auxiliary power unit No. 2 will be hot-fired as part of planned launch preparations. This coming weekend, workers will complete SPACEHAB payload testing and drag chute door installation. During yesterday’s Flight Readiness Review, Shuttle managers confirmed plans to use a functional drag chute and strengthened drag chute door assembly on the upcoming flight. Inconel hinge-pins will replace the aluminum pins that failed during the STS-95 flight, allowing the drag chute door to fall off during liftoff.
STS-96 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-93 -- Chandra X-ray Observatory (formerly AXAF)
NOTE: Payload bay radiator inspections concluded yesterday. Final inspection of Columbia’s thermal protection system is under way and auxiliary power unit lubrication oil servicing resumes tomorrow. Tomorrow, Columbia’s drag chute door will be installed. The orbiter’s nose and main landing gear is slated for installation next week.
STS-99 -- SHUTTLE RADAR TOPOGRAPHY MISSION (SRTM)NOTE: Modifications to Endeavour’s main engine dome heat shields continue. Freon coolant loop No. 2 modifications are in work also. Next week, fuel cell voltage testing begins. Orbiter docking system harness installation continues.
STS-101 -- 3rd INTERNATIONAL SPACE STATION FLIGHT - SPACEHAB DOUBLE MODULE/ICCNOTE: Atlantis continues to undergo wireless video modifications. Engine dome heat shield removal begins tonight. Navigation system wiring efforts are in work today and tomorrow. Payload bay liner modifications proceed on schedule.
For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/