KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      THURSDAY, MAY 13, 1999 (6:05 PM EDT)

      MISSION: STS-96 -- 2nd U.S. INTERNATIONAL SPACE STATION FLIGHT - SPACEHAB DOUBLE MODULE
      • VEHICLE: Discovery/OV-103
      • LOCATION: Launch Pad 39B
      • TARGET KSC LAUNCH DATE/TIME: No earlier than May 27, 1999 at 6:48 a.m. EDT
      • TARGET KSC LANDING DATE/TIME: June 6, 1999 at 2:45 a.m. EDT
      • LAUNCH WINDOW: 10 minutes
      • ISS DOCKING DATE: May 29, 1999 at 12:25 a.m. EDT
      • ISS UNDOCKING DATE: June 3, 1999 at 6:37 p.m. EDT
      • MISSION DURATION: 9 days, 19 hours
      • CREW: Rominger, Husband, Ochoa, Jernigan, Barry, Payette, Tokarev
      • ADDITIONAL PAYLOADS: ICC, STARSHINE, SVF AND IVHM
      • ORBITAL ALTITUDE and INCLINATION: 173 nautical miles/51.6 degrees

      NOTE: NASA Shuttle managers decided today to roll Space Shuttle Discovery back to the Vehicle Assembly Building to complete repair work on the hail-damaged external tank foam insulation. After much evaluation, managers determined that necessary repair work could not be performed at Launch Pad 39B due to limited access to damaged areas. Managers expect Discovery's move toward the VAB to begin early Sunday morning, May 16. Current work plans indicate that the foam repairs will take 2 to 3 days, allowing Discovery to roll back to Pad 39B by midweek. Managers expect the Shuttle to be ready for launch no earlier than May 27.

      Workers will move the STS-93 external tank and booster stack out of VAB high bay 1 Saturday, May 15, to accommodate Shuttle Discovery's return. Once in the VAB, external tank access will be established immediately and workers will inspect the areas that were inaccessible at the pad. At least 35 foam divots have been identified for repair to date.

      Last weekend, a hailstorm at KSC left about 150 divots in the outer foam of Discovery's external fuel tank. The average diameter of the divots is about 0.5 inches with the largest measuring about 2 inches in diameter. The depth of the dings range from 0.1 to 0.34 inches deep. Shuttle managers' primary concern is that ice could form inside the divots once the tank is loaded with super-cold propellants and then fall off during launch, impacting the orbiter and posing a threat to flight crew safety.

      --end--

      For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

      To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."

      Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/


      Author: Joel Wells / NASA Public Affairs
      Curator: Kay Grinter (kay.grinter-1@ksc.nasa.gov) / Information Dynamics, Inc.

      Go to the Previous Space Shuttle Status Report
      Go to the Next Space Shuttle Status Report

      Go to the Status Reports Home Page