MISSION: STS-106 -- 4th ISS Flight (2A.2b) |
|
|
| VEHICLE |
Atlantis/OV-104 |
| LOCATION |
OPF bay 3 |
| TARGET KSC
LAUNCH DATE/TIME |
Sept. 8, 2000 at
8:45 a.m. EDT (preferred launch time) |
| TARGET KSC LANDING DATE/TIME |
Sept. 19, 2000 at 4:59 a.m. |
| LAUNCH WINDOW |
2 1/2 minutes |
| MISSION DURATION |
10 days, 20 hours and 14 minutes |
| CREW |
Wilcutt, Altman, Lu, Malenchenko, Morukov, Mastracchio, Burbank |
| ORBITAL ALTITUDE and INCLINATION |
177 nautical miles/51.6 degrees |
|
| Shuttle Processing Note |
| KSC entered Hurricane
Condition IV today as a precaution for Hurricane Debby. This is the first level of
hurricane preparedness to assure all necessary supplies and equipment are on hand in the
event KSC is threatened with 50-knot sustained winds. A decision will be made Wednesday
morning whether to upgrade this status to the next level of hurricane preparedness.
Because Hurricane Debby is still too far away to accurately determine its ultimate course
or impact to central Florida, no decision to rollback Space Shuttle Atlantis will be made
before Wednesday. At the launch pad, technicians
have completed efforts to mate the SPACEHAB tunnel inside orbiter Atlantis and payload
interface verification testing is ongoing. The Helium Signature Test continues today.
Further Shuttle processing will continue on schedule with prelaunch propellant loading
beginning tomorrow, pending management's decision on hurricane preparedness.
| Milestones |
| |
| |
Prelaunch propellant
loading of orbiter storage tanks |
Aug. 23
|
|
|
Orbiter aft
compartment close-outs begin |
Aug. 28 |
|
| |
Orbiter payload bay
doors closed for flight |
Aug 30 |
|
| |
Space
suit functional testing |
Aug.
30 |
|
| |
Shuttle Atlantis
begins roll out to Launch Pad 39B |
Aug. 13 at about 11
p.m. |
|
|
Terminal Countdown Demonstration Test |
Aug. 17-18 |
|
|
|
|
MISSION: STS-92 -- 5th ISS Flight (3A) -- Z-1 Truss, PMA-3 |
|
|
| VEHICLE |
Discovery/OV-103 |
| LOCATION |
OPF bay 3 |
| TARGET KSC LAUNCH
DATE/TIME |
Oct. 5, 2000 at 9:30
p.m. EDT |
| TARGET KSC LANDING DATE/TIME |
Oct. 16, 2000 at about 5 p.m. |
| MISSION DURATION |
11 days |
| CREW |
Duffy, Melroy, Wakata, Chiao, Wisoff, Lopez-Alegria, McArthur |
| ORBITAL ALTITUDE and
INCLINATION |
177 nautical miles/51.6
degrees |
|
| Shuttle Processing Note |
| Following yesterday's
transfer from OPF bay 1 to OPF bay 3, orbiter Discovery remains mounted to the orbiter transporter
inside OPF bay 3. The orbiter is being temporarily stored in bay 3 while modifications begin in
bay 1. Pending completion of ongoing payload and ground processing assessments, orbiter Discovery
will move to the VAB no earlier than Thursday to be mated with the external tank and boosters. KSC
managers will continue to monitor weather developments in the tropics while planning the remainder
of Discovery's processing flow. At the Space Station
Processing Facility, engineers working on the Z-1 truss have removed the thermostat heater
assemblies associated with each of the four control moment gyros. The heater assemblies were sent
to the manufacturer for adjustments to assure their reliable and proper operation at extremely
cold temperatures. At this time, the Z-1 truss is scheduled to be transported to the launch pad
during the second week of September. No impact to the Oct. 5 launch date is anticipated.
|
|
|
MISSION: STS-97 -- 6th ISS Flight (4A) -- PV Module P6 |
|
|
| VEHICLE |
Endeavour/OV-105 |
| LOCATION |
OPF bay 2 |
| TARGET KSC LAUNCH
DATE/TIME |
Nov. 30, 2000 at time
10:48 p.m. |
| TARGET KSC LANDING DATE/TIME |
Dec. 9, 2000 at time TBD |
| MISSION DURATION |
9 days |
| CREW |
Jett, Bloomfield, Tanner, Noriega, Garneau |
| ORBITAL ALTITUDE and
INCLINATION |
177 nautical miles/51.6
degrees |
|
| Shuttle Processing Note |
Functional tests of
Endeavour's docking mechanism are complete. Standard rigging work continues on the orbiter's right
hand external tank umbilical door. Endeavour's thermal protective "chin panel" is being
installed beneath the orbiter's nose.
|
|
|
|
|
|
|
|
|
|