| VEHICLE |
Atlantis/OV-104/ |
| LOCATION |
Orbiter
Processing Facility bay 3 |
| TARGET KSC LAUNCH
DATE/TIME |
NET
April 17, 2000 at about 7:03 p.m. (under review) |
| TARGET KSC LANDING
DATE/TIME |
April
28, 2000 at about 3:30 p.m. |
| LAUNCH
WINDOW |
up
to 10 minutes |
| MISSION
DURATION |
11
days |
| CREW |
Halsell,
Horowitz,
Weber,
Williams,
Voss,
Helms,
Usachev |
| ORBITAL ALTITUDE and
INCLINATION |
160
nautical miles/51.6 degrees |
|
|
| Shuttle
Processing Note |
|
Shuttle managers today announced a target launch
date of no earlier than April 17 for Shuttle Atlantis. The new date accommodates
Shuttle processing and flight crew training requirements.
Following minor delays during rollover
preparations, orbiter Atlantis is now scheduled to rollover to the Vehicle
Assembly Building later today pending weather constraints. Once Atlantis is
mated to the external tank and solid rocket boosters in VAB high bay 3, main
engine No. 1 will be replaced. The work will be completed in the VAB over a
period of about 3 days. Space Shuttle Atlantis is currently slated for rollout
to Launch Pad 39A on March 24.
|
|
MISSION:
STS-92
-- 5th ISS Flight (3A) -- Z-1 Truss, PMA-3 |
|
| VEHICLE |
Discovery/OV-103 |
| LOCATION |
OPF
bay 1 |
| TARGET KSC LAUNCH
DATE/TIME |
TBD |
| TARGET KSC LANDING
DATE/TIME |
TBD |
| MISSION
DURATION |
11
days |
| CREW |
Duffy,
Melroy, Wakata, Chiao, Wisoff, Lopez-Alegria, McArthur |
| ORBITAL ALTITUDE and
INCLINATION |
160
nautical miles/51.6 degrees |
|
|
| Shuttle
Processing Note |
|
Auxiliary power unit leak and
functional tests are complete. Leak checks of Discovery's
orbiter docking system continue. The integrated hydraulic
test is scheduled this week. Robot arm servicing begins
this week.
|
|
|
MISSION:
STS-97
-- 6th ISS Flight (4A) -- PV Module P6 |
|
| VEHICLE |
Endeavour/OV-105 |
| LOCATION |
OPF bay 2 |
| TARGET KSC LAUNCH
DATE/TIME |
TBA |
| TARGET KSC LANDING
DATE/TIME |
TBA |
| MISSION
DURATION |
9 days |
| CREW |
Jett,
Bloomfield, Tanner, Noriega, Garneau |
| ORBITAL ALTITUDE and
INCLINATION |
173
nautical miles/51.6 degrees |
|
|
Shuttle
Processing Note |
Testing
of Endeavour's radiators is complete. Orbiter
maneuvering system pod functional tests continue and
preparations to remove Endeavour's external airlock are
ongoing.
|