MISSION: STS-100 -- 9th
ISS Flight (6A) - Raffaello MPLM, SSRMS |
| Vehicle |
Endeavour/OV-105 |
| Location |
On orbit |
| Official KSC Launch Date/Time |
April 19, 2001, at 2:41 p.m. EDT |
| KSC Landing Date/Time |
May 1, 2001, at 9:15 a.m. EDT |
| Mission Duration |
11 days, 18 hours and 34 minutes |
| Crew |
Rominger, Ashby, Hadfield, Parazynski,
Phillips, Guidoni, Lonchakov |
| Orbit Altitude and Inclination |
173 nautical miles/51.6 degrees |
|
|
|
Shuttle
Processing Note (orbiter
processing notes) |
| Space Shuttle Endeavour remains in good health as mission managers today added an extra day to the mission. The extension affords the crew and flight controllers additional time to bring the Space Station's backup command and control computers on line. A further mission extension is possible if additional troubleshooting time is needed.
|
|
|
MISSION:
STS-104
-- 10th
ISS Flight (7A) - Airlock |
| Vehicle |
Atlantis/OV-104 |
| Location |
OPF bay 3 |
| Target KSC Launch Date/Time |
NET June 14, 4:15 p.m. EDT |
| Target KSC Landing Date/Time |
June 25, 12:30 p.m. EDT |
| Mission Duration |
11 days |
| Crew |
Lindsey, Hobaugh, Kavandi, Gernhardt,
Reilly |
| Orbit Altitude and Inclination |
122 nautical miles/51.6 degrees |
| |
|
Shuttle
Processing Note (orbiter
processing notes) |
Technicians have serviced Atlantis' potable water system and the water spray boilers. Functional tests of the orbiter's waste system are in progress along with main propulsion system leak checks.
Russian engineers are en route to KSC to troubleshoot an alignment component on Atlantis' docking mechanism known as a "fixer." The component failed preliminary functional tests earlier in the flow but has operated normally since. As a precaution, managers have decided to repair the component or replace the docking mechanism whichever is required. At this time the additional work is not expected to affect the target launch date. |
|
|
MISSION:
STS-105
-- 11th
ISS Flight (7A.1) - Leonardo MPLM |
| Vehicle |
Discovery/OV-103 |
| Location |
OPF bay 2 |
| Target KSC Launch Date/Time |
July 12, 2001, at 4:45 a.m. EDT |
| Target KSC Landing Date/Time |
July 23, 2001, at TBD |
| Mission Duration |
11 days |
| Crew |
Horowitz, Struckow, Barry,
Forrester; (up) Culbertson, Dezhurow, Turin; (down) Voss, Helms,
Usachev |
| Orbit Altitude and Inclination |
122 nautical miles/51.6 degrees |
|
|
|
Shuttle
Processing Note (orbiter
processing notes) |
| Technicians have completed functional tests on Discovery's airlock upper hatch. Auxiliary power unit leak and functional tests are in work today. This week, managers plan to install Discovery's drag chute. |
|
|
MISSION:
STS-109
-- HST
Servicing Mission 3B |
| Vehicle |
Columbia/OV-102 |
| Location |
OPF bay 1 |
| Target KSC Launch Date/Time |
Nov. 19 (under review) |
| Target KSC Landing Date/Time |
Nov. 30 (under review) |
| Mission Duration |
11 days |
| Crew |
Altman, Carey, Grunsfeld, Currie,
Newman, Linnehan, Massimino |
| Orbit Altitude and Inclination |
308 nautical miles/28.5 degrees |
|
|
|
|
Shuttle
Processing Note (orbiter
processing notes) |
| Valve replacement work on Columbia's water spray boilers is complete. Servicing of the orbiter's freon coolant loop No. 2 continues. Preparations are also being made to transfer Columbia to VAB high bay 4 to make room for Endeavour's return from STS-100. That move is now scheduled to occur Tuesday. |
|
|