MISSION:
STS-105
-- 11th
ISS Flight (7A.1) - Leonardo MPLM |
| Vehicle |
Discovery/OV-103 |
| Location |
On orbit |
| KSC
Launch Date/Time |
August 10,
2001 at 5:10:14
p.m. EDT |
| Target KSC
Landing Date/Time |
August 22,
2001 at 12:48
p.m. |
| Mission
Duration |
11 days,
19 hours, 38 minutes |
| Crew |
Horowitz,
Sturckow, Barry, Forrester; (ISS-3 up) Culbertson,
Dezhurow, Turin; (ISS-2 down) Usachev, Helms, Voss |
| Orbital
Insertion Altitude and Inclination |
122 nautical miles/51.6 degrees |
|
|
|
Processing Note (previous
notes) |
| Post-launch inspections at Launch Pad 39A revealed no abnormal damage to the Fixed Service Structure, Mobile Launcher Platform and Rotating Service Structure. The booster recovery ships returned to Hangar AF Sunday morning with both solid rocket boosters in tow. Preliminary inspections indicate that the boosters are in excellent health and routine assessments begin today. |
| |
|
MISSION:
STS-108 --
12th ISS
Flight (UF1) - Raffaello MPLM |
| Vehicle |
Endeavour/OV-105 |
| Location |
Orbiter Processing
Facility (OPF) bay 1 |
| Target KSC Launch
Date/Time |
Nov. 29, 2001 at 7:23
p.m. EST |
| Target KSC Landing
Date/Time |
Dec. 9, 2001 |
| Mission Duration |
10 days |
| Crew |
Gorie, Kelly,
Godwin, Tani; (ISS-4 up) Onufrienko, Bursch, Walz; (ISS-3
down) Culbertson, Dezhurov, Tyurin |
| Orbital Insertion
Altitude and Inclination |
122 nautical miles/51.6 degrees |
|
| |
|
Shuttle
Processing Note (previous
notes) |
| Technicians have finished draining Endeavour's auxiliary power unit fuel system. Modification to the orbiter's environmental and life support system is under way. Endeavour's robot arm is being tested prior to being turned around for flight. |
| |
|
Payload
Processing Note (previous
notes) |
| In the Space Station Processing Facility, inspections on the external top of the MPLM
are complete and the module was recently rotated for inspections on the bottom. |
| |
|
|
MISSION:
STS-109
-- HST
Servicing Mission 3B |
| Vehicle |
Columbia/OV-102 |
| Location |
Orbiter Processing
Facility bay 3 |
| Target KSC Launch
Date/Time |
Jan. 17, 2002 at 3:52
a.m. EST |
| Target KSC Landing
Date/Time |
Jan. 28, 2002 |
| Mission Duration |
TBD |
| Crew |
Altman, Carey,
Grunsfeld, Currie, Newman, Linnehan, Massimino |
| Orbital Insertion
Altitude and Inclination |
308
nautical miles/28.5 degrees |
|
| |
|
Shuttle
Processing Note (previous
notes) |
| Workers have completed orbiter maneuvering system cross feed line flushing. Today, Columbia's window No. 2 is being replaced. Checks on the water spray boiler and onboard atmosphere pressurization system are in work. Later this week, workers will upgrade Columbia's payload floodlights and replace window No. 1. |
| |
|
MISSION:
STS-110
-- 13th
ISS Flight (8A) - ITS, S0, MT |
| Vehicle |
Atlantis/OV-104 |
| Location |
Orbiter Processing
Facility bay 2 |
| Target KSC Launch Date/Time |
Feb. 28, 2002 |
| Target KSC Landing Date/Time |
March 9, 2002 |
| Mission Duration |
9 days |
| Crew |
Bloomfield, Frick,
Ross, Smith, Ochoa, Morin, Walheim |
| Orbital Insertion Altitude
and Inclination |
122 nautical miles
/51.6 degrees |
|
|
Shuttle
Processing Note (previous notes) |
| Technicians have completed inspections on Atlantis' main propulsion system 17-inch quick disconnects. Orbiter maneuvering system pod checks are ongoing and radiator checks are scheduled to occur this week.
|
|
|
|