August 16, 2001

 
2001 Year at a Glance

Status Reports

July Status Reports
 
Note

This is an orbiter processing report and does not necessarily reflect the chronological order of upcoming Space Shuttle flights.  Visit http://www-pao.ksc.nasa.gov/kscpao/schedule/schedule.htm for the latest schedule of future Shuttle missions.

 

MISSION: STS-105 -- 11th ISS Flight (7A.1) - Leonardo MPLM

Vehicle Discovery/OV-103
Location On orbit
KSC Launch Date/Time August 10, 2001 at 5:10:14 p.m. EDT
Target KSC Landing Date/Time August 22, 2001 at 12:48 p.m.
Mission Duration 11 days,  19 hours, 38 minutes
Crew Horowitz, Sturckow, Barry, Forrester; (ISS-3 up) Culbertson, Dezhurow, Turin; (ISS-2 down) Usachev, Helms, Voss
Orbital Insertion Altitude and Inclination 122 nautical miles/51.6 degrees
 

Note  (previous notes)

On orbit activities continue today with the first EVA (spacewalk) currently under way. Landing remains scheduled for KSC on Wednesday, Aug. 22 at 12:48 p.m. Weather forecasters are currently monitoring a tropical system and its potential impact, if any, on next week's landing opportunities at KSC. Post-flight solid rocket booster inspections continue on schedule at Hangar AF. Inspectors report that both boosters are in good condition having sustained no abnormal damage. Nozzle removal begins today followed by forward skirt removal Friday. Booster disassembly will continue through next week.
 

MISSION: STS-108 -- 12th ISS Flight (UF1) - Raffaello MPLM

Vehicle Endeavour/OV-105
Location Orbiter Processing Facility (OPF) bay 1
Target KSC Launch Date/Time Nov. 29, 2001 at 7:23 p.m. EST
Target KSC Landing Date/Time Dec. 9, 2001
Mission Duration 10 days
Crew Gorie, Kelly, Godwin, Tani; (ISS-4 up) Onufrienko, Bursch, Walz; (ISS-3 down) Culbertson, Dezhurov, Tyurin 
Orbital Insertion Altitude and Inclination 122 nautical miles/51.6 degrees
 

Shuttle Processing Note  (previous notes)

Testing of the orbiter's robot arm is complete. The docking mechanism is scheduled for a functional test next week. Also, the Mobile Launcher Platform is scheduled to be moved to the Vehicle Assembly Building next Monday and booster-stacking operations will commence on Aug. 27.
 

MISSION: STS-109 -- HST Servicing Mission 3B

Vehicle Columbia/OV-102
Location Orbiter Processing Facility bay 3
Target KSC Launch Date/Time Jan. 17, 2002 at 3:52 a.m. EST
Target KSC Landing Date/Time Jan. 28, 2002
Mission Duration 11 days
Crew Altman, Carey, Grunsfeld, Currie, Newman, Linnehan, Massimino 
Orbital Insertion Altitude and Inclination 308 nautical miles/28.5 degrees
 

Shuttle Processing Note  (previous notes)

Workers have completed orbiter maneuvering system crossfeed line purges. The orbiter's nose cap will be installed late next week.
 

MISSION: STS-110 -- 13th ISS Flight (8A) - ITS, S0, MT

Vehicle Atlantis/OV-104
Location Orbiter Processing Facility bay 2
Target KSC Launch Date/Time Feb. 28, 2002
Target KSC Landing Date/Time March 9, 2002
Mission Duration 9 days
Crew Bloomfield, Frick, Ross, Smith, Ochoa, Morin, Walheim
Orbital Insertion Altitude and Inclination 122 nautical miles /51.6 degrees
 

Shuttle Processing Note  (previous notes)

Orbiter maneuvering system pod checks are complete. The payload bay doors will be closed on Saturday and the orbiter readied for transfer to the VAB temporarily next Tuesday. This will open up OPF bay 2 for Discovery's post-mission deservicing following its landing next week. Atlantis will likely remain in the VAB for about three weeks.
 

The KSC Newsroom offers two electronic subscription services. To receive status reports on the processing of Space Shuttles and their payloads and expendable launch vehicles and their NASA payloads, send an e-mail message with the instructions "subscribe shuttle-status" to domo@news.ksc.nasa.gov. Send a separate message to the same e-mail address with the instructions "subscribe ksc-press-release" for KSC-issued press releases. The instructions should be in the body, not the subject line, of the messages and should not include quotation marks. The system will confirm each subscription via e-mail.

 
KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines

Page Last Revised

Page & Curator Information

08/16/2001

Curator: Kay Grinter (Kay.Grinter-1@ksc.nasa.gov) -- InDyne, Inc./
Web Development: JBOSC Web Development Team
A Service of the NASA/KSC External Relations and Business Development Directorate
JoAnn H. Morgan, Director