MISSION: STS-100 -- 9th
ISS Flight (6A) - Raffaello MPLM, SSRMS |
| Vehicle |
Endeavour/OV-105 |
| Location |
Orbiter Processing Facility (OPF) bay 2 |
| Target KSC Launch Date/Time |
April 19, 2001, at 3:12 p.m. EDT |
| Target KSC Landing Date/Time |
April 30, 2001, at 11:10 a.m. EDT |
| Mission Duration |
11 days |
| Crew |
Rominger, Ashby, Hadfield, Parazynski,
Phillips, Guidoni, Lonchakov |
| Orbit Altitude and Inclination |
173 nautical miles/51.6 degrees |
|
|
|
Shuttle
Processing Note |
| Orbiter Endeavour's midbody and aft engine compartments have been closed-out in preparation for rollover to the Vehicle Assembly Building. Weight and center of gravity tests begin tomorrow and first motion is scheduled for Saturday at about 9 a.m. Technicians are troubleshooting an overhead switch panel in the crew module while rollover preparations proceed on schedule. |
|
|
|
MISSION: STS-104 -- 10th
ISS Flight (7A) - Airlock |
| Vehicle |
Atlantis/OV-104 |
| Location |
OPF bay 3 |
| KSC Launch Date/Time |
NET June 8, 6:50 p.m. EDT |
| KSC Landing Date/Time |
June 19, 2:24 p.m. EST |
| Mission Duration |
11 days |
| Crew |
Lindsey, Hobaugh, Kavandi, Gernhardt,
Reilly |
| Orbit Altitude and Inclination |
122 nautical miles/51.6 degrees |
|
|
|
Shuttle
Processing Note |
| Orbiter Atlantis' post-ferry deconfiguration concluded last week with tail cone removal. Main engine heat shield removal is in work today and technicians begin main engine removal Friday morning. Forward reaction control system (FRCS) checks are in work today and flash evaporator system checks occur later this week.
|
|
|
COLUMBIA/OV-102
Post-Ferry Processing |
|
In OPF bay 1, Columbia's simulated FRCS pod is being removed today. The tail cone will be removed Friday and the payload bay doors will be opened for processing activities. Columbia is scheduled to remain in OPF 1 through late April and then move to the VAB for storage until OPF bay 3 becomes available. Columbia's next flight is under review, but could occur as early as this fall. |
|