MISSION: STS-100 -- 9th
ISS Flight (6A) - Raffaello MPLM, SSRMS |
| Vehicle |
Endeavour/OV-105 |
| Location |
En route to Launch Pad 39A |
| Target KSC Launch Date/Time |
April 19, 2001, at 3:12 p.m. EDT |
| Target KSC Landing Date/Time |
April 30, 2001, at 11:10 a.m. EDT |
| Mission Duration |
11 days |
| Crew |
Rominger, Ashby, Hadfield, Parazynski,
Phillips, Guidoni, Lonchakov |
| Orbit Altitude and Inclination |
173 nautical miles/51.6 degrees |
|
|
|
Shuttle
Processing Note (orbiter
processing notes) |
| Space Shuttle Endeavour rolled out of the Vehicle Assembly Building today at about 9:50 a.m. Solid rocket booster closeout inspections slightly delayed first motion, and Endeavour is now expected to arrive at the pad before 4 p.m. Once at the pad, routine launch pad validations commence, verifying all vehicle and facility interfaces. |
|
|
|
Upcoming
Milestones (dates are targets only) |
| Shuttle main engine flight readiness test |
March 25 |
| Shuttle helium signature leak test complete |
March 28 |
| Terminal Countdown Demonstration Test |
March 29-30 |
| Orbiter prelaunch propellant loading begins |
April 2 |
| Flight Readiness Review |
April 5 |
|
|
|
|
|
|
MISSION: STS-104 -- 10th
ISS Flight (7A) - Airlock |
| Vehicle |
Atlantis/OV-104 |
| Location |
OPF bay 3 |
| Target KSC Launch Date/Time |
NET June 14, 4:15 p.m. EDT |
| Target KSC Landing Date/Time |
June 25, 12:30 p.m. EDT |
| Mission Duration |
11 days |
| Crew |
Lindsey, Hobaugh, Kavandi, Gernhardt,
Reilly |
| Orbit Altitude and Inclination |
122 nautical miles/51.6 degrees |
|
|
|
Shuttle
Processing Note (orbiter
processing notes) |
| Atlantis' orbital maneuvering system pods are undergoing standard functional tests today. Workers are preparing for orbiter fuel cell voltage tests on Saturday. Additional forward reaction control system inspections are ongoing.
|
|
|
MISSION: STS-105 -- 11th
ISS Flight (7A.1) - Leonardo MPLM |
| Vehicle |
Discovery/OV-103 |
| Location |
OPF bay 2 |
| Target KSC Launch Date/Time |
July 12, 2001, at 4:45 a.m. EDT |
| Target KSC Landing Date/Time |
July 22, 2001, at 12:29 a.m. EDT |
| Mission Duration |
10 days |
| Crew |
Horowitz, Struckow, Barry, Forrester; (up)
Culbertson, Dezhurow, Turin; (down)
Voss, Helms, Usachev; |
| Orbit Altitude and Inclination |
122 nautical miles/51.6 degrees |
|
|