MISSION:
STS-107
-- SPACEHAB/Freestar
Research Mission |
| Vehicle |
Columbia/OV-102 |
| Target KSC Launch
Date/Time |
July 19, 2002 |
| Target KSC Landing
Date/Time |
August 4, 2002 |
| Mission Duration |
16 days |
| Crew |
Husband, McCool,
Anderson, Chawla, Brown, Clark, Ramon |
| Orbital Insertion
Altitude/ Inclination |
150
nautical miles/39 degrees |
|
| |
|
Shuttle
Processing Note (previous
notes) |
| In the Orbiter Processing Facility (OPF), the Extended Duration Orbiter pallet has been installed aboard Shuttle Columbia. Shuttle managers have made the decision to change out and retest a cold plate in Payload Bay 5 after several dings were discovered on the plate surface. Freon Coolant Loop No. 2 will be drained today to accommodate the cold plate changeout. Columbia will remain powered down until the cold plate is re-installed and the two freon loops are
reserviced. |
|
|
|
MISSION:
STS-112
-- 15th
ISS Flight (9A) - BA, ITS S1 TRUSS |
| Vehicle |
Atlantis/OV-104 |
| Target KSC Launch Date |
August 22, 2002 |
| Target KSC Landing Date/Time |
September 1, 2002 |
| Mission Duration |
10 days |
| Crew |
Ashby, Melroy, Wolf,
Sellers, Magnus, Yurchikhin |
| Orbital Insertion Altitude/Inclination |
122 nautical miles/51.6 degrees |
|
| |
|
Shuttle
Processing Note (previous notes) |
| Deservicing of Shuttle Atlantis is ongoing in the OPF following the orbiter's return from the highly successful STS-110 mission last week. The heat shield has been removed and preparations are in work to remove the Space Shuttle Main Engines early next week.
|
|
|
|
ORBITER
MAJOR MODIFICATION PERIOD |
|
|
|
|
|
Shuttle
Processing Note (previous
notes) |
| Discovery rolled back to the OPF yesterday after a brief storage period in the VAB. The orbiter is scheduled to begin its Major Modification period late this summer. |
|
|
|