January 8, 2002

 
2002 Year at a Glance

Status Reports

December Status Reports
 
Note

This is an orbiter processing report and does not necessarily reflect the chronological order of upcoming Space Shuttle flights.  Visit http://www-pao.ksc.nasa.gov/kscpao/schedule/schedule.htm for the latest schedule of future Shuttle missions.

 

MISSION: STS-109 -- HST Servicing Mission 3B

Vehicle Columbia/OV-102
Target KSC Launch Date/Time NET Feb. 21, 2002
Target KSC Landing Date/Time March 4, 2002
Mission Duration 11 days
Crew Altman, Carey, Grunsfeld, Currie, Newman, Linnehan, Massimino 
Orbital Insertion Altitude and Inclination 308 nautical miles/28.5 degrees
 

Shuttle Processing Note  (previous notes)

Shuttle Columbia is undergoing final prelaunch checkouts in the Orbiter Processing Facility (OPF). Verification testing of Auxiliary Power Unit (APU) No. 3 is complete. Aft closeouts are in progress. Shuttle managers will reassess the launch date for STS-109 later this week, pending Hubble Space Telescope payload status.
 

MISSION: STS-110 -- 13th ISS Flight (8A) - ITS S0 TRUSS, MOBILE TRANSPORTER

Vehicle Atlantis/OV-104
Target KSC Launch Date/Time NET April 4, 2002
Target KSC Landing Date/Time April 15, 2002
Mission Duration 11 days
Crew Bloomfield, Frick, Ross, Smith, Ochoa, Morin, Walheim
Orbital Insertion Altitude and Inclination 122 nautical miles /51.6 degrees
 

Shuttle Processing Note  (previous notes)

Work continues on Shuttle Atlantis in the OPF to remove two Orbiter Maneuvering System (OMS) pods to inspect the status of attach point No.5 and make repairs, if necessary. Over the weekend, hypergolic de-servicing of the OMS cross feed line was completed. Aft flight deck reconfiguration is in work.
 

MISSION: STS-111 -- 14th ISS Flight (UF2) - MPLM

Vehicle Endeavour/OV-105
Target KSC Launch Date/Time May 2, 2002
Target KSC Landing Date/Time May 13, 2002
Crew Cockrell, Lockhart, Chang-Diaz, Perrin; (ISS-5 up) Korzun, Whitson, Treschev; (ISS-4 down) Onufrienko, Bursch, Walz 
Orbital Insertion Altitude and Inclination 122 nautical miles/51.6 degrees
 

Shuttle Processing Note  (previous notes)

Post-landing checkout of the Forward Reaction Control System (FRCS) and OMS pods aboard Shuttle Endeavour are in progress in the OPF. The Raffaello Multi-Purpose Logistics Module (MPLM) was removed from the payload bay Monday and transported to the Space Station Processing Facility.
 

STRUCTURAL INSPECTION & MODIFICATION PERIOD

Vehicle Discovery/OV-103
 

Shuttle Processing Note  (previous notes)

Orbiter Discovery is in temporary storage in a high bay of the Vehicle Assembly Building awaiting a decision by Shuttle managers on the content, schedule and location for the structural inspection and modification down period. Discovery is scheduled to return to the OPF in mid-January.
 

The Kennedy Space Center (KSC) Newsroom offers an electronic subscription service for status reports, news releases and other notices issued from KSC. There are two possible ways to subscribe.  You may send a blank e-mail message to ksc-news_release-subscribe@kscnews.ksc.nasa.gov or follow the instructions on the Web site at http://kscnews.ksc.nasa.gov. The system will confirm the request via e-mail.

 
KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines

Page Last Revised

Page & Curator Information

01/09/2002

Curator: Kay Grinter (Kay.Grinter-1@ksc.nasa.gov) -- InDyne, Inc./
Web Development: JBOSC Web Development Team
A Service of the NASA/KSC External Relations and Business Development Directorate
JoAnn H. Morgan, Director