MISSION:
STS-110
-- 13th
ISS Flight (8A) - ITS S0 TRUSS, MOBILE TRANSPORTER |
| Vehicle |
Atlantis/OV-104 |
| Target KSC Launch Date/Time |
April 4, 2002;
Launch period: 2 p.m. to 6 p.m. EST |
| Target KSC Landing Date/Time |
April 15, 2002 |
| Mission Duration |
11 days |
| Crew |
Bloomfield, Frick,
Ross, Smith, Ochoa, Morin, Walheim |
| Orbital Insertion Altitude/Inclination |
122 nautical miles/51.6 degrees |
|
|
Shuttle
Processing Note (previous notes) |
| The seven STS-110 crewmembers were at KSC earlier this week to participate in the Shuttle Atlantis Terminal Countdown Demonstration Test that was completed on Tuesday. Loading of the hypergolic fuels is in process and the Auxiliary Power Unit
(APU) hot fire tests are scheduled for Friday. Weekend work includes replacement and retest of a Master Events Controller and an APU hydraulic pump in the right aft Solid Rocket Booster
(SRB), after x-rays indicated a possible problem with bolt inserts that secure the pump to the
SRB. Shuttle Atlantis remains on schedule for its launch to the International Space Station on April 4. |
|
|
|
MISSION:
STS-111 --
14th ISS
Flight (UF2) - MPLM |
| Vehicle |
Endeavour/OV-105 |
| Target KSC Launch
Date/Time |
May 6, 2002 |
| Target KSC Landing
Date/Time |
May 17, 2002 |
| Crew |
Cockrell,
Lockhart, Chang-Diaz, Perrin; (ISS-5 up) Korzun, Whitson,
Treschev; (ISS-4
down) Onufrienko, Bursch, Walz |
| Orbital Insertion
Altitude/Inclination |
122 nautical miles/51.6 degrees |
|
|
|
|
Shuttle
Processing Note (previous
notes) |
| In the Orbiter Processing Facility
(OPF), the Hydraulic/Flight Control test on Shuttle Endeavour has been successfully completed. Potable water servicing and final aft closeouts are in work in preparation for the STS-111 mission. |
|
|
|
MISSION:
STS-107
-- SPACEHAB/Freestar
Research Mission |
| Vehicle |
Columbia/OV-102 |
| Target KSC Launch
Date/Time |
NET July 11, 2002 |
| Target KSC Landing
Date/Time |
July 27, 2002 |
| Mission Duration |
16 days |
| Crew |
Husband, McCool,
Anderson, Chawla, Brown, Clark, Ramon |
| Orbital Insertion
Altitude/ Inclination |
150
nautical miles/39 degrees |
|
| |
|
Shuttle
Processing Note (previous
notes) |
| Post-landing processing of Shuttle Columbia continues in the OPF. The Hubble payload components have been off-loaded and work is in progress to remove the Remote Manipulator System and de-service the hypergolic residual propellants. X-rays of the freon coolant loops are continuing. |
|
|
|
ORBITER
MAJOR MODIFICATION PERIOD |
|
|
|
|
|
Shuttle
Processing Note (previous
notes) |
| Discovery is in the OPF awaiting the start of its Orbiter Major Modification (OMM) period that is scheduled to begin at the Kennedy Space Center late this summer.
|
|
|
|
|