MISSION:
STS-112
-- 15th
ISS Flight (9A) - S1 Truss Segment |
| Vehicle |
Atlantis/OV-104 |
| Target Launch Date |
October 2, 2002
NET |
| Target Launch
Period |
2 - 6 p.m. EDT |
| Target Landing Date |
October 13, 2002 |
| Mission Duration |
11 days |
| Crew |
Ashby, Melroy, Wolf,
Sellers, Magnus, Yurchikhin |
| Orbital Insertion Altitude/Inclination |
122 nautical miles/51.6 degrees |
|
| |
|
Shuttle
Processing Note (previous notes) |
Final preparations for Atlantis’ lift-off to the International Space Station continue in work. Last week a block was installed in the payload bay on the Manipulator Positioning Mechanism, which is attached to the Remote Manipulator System, due to a small gap. After the block was installed and final adjustments were made to the driveline linkage, the gap was eliminated.
Preparations are also in work for payload installation, the Terminal Countdown Demonstration Test and Helium Leak checks on the Main Propellant System, which are all scheduled for this week. Preparations are also in work for propellant loading later in the week. Tomorrow, mission managers will met at KSC for the Flight Readiness Review.
|
|
|
|
MISSION:
STS-113 --
16th ISS
Flight (11A) - P1 Truss Segment |
| Vehicle |
Endeavour/OV-105 |
| Target Launch Date |
November 10, 2002
NET |
| Target Landing Date |
November 20, 2002 |
| Mission Duration |
11 days |
| Crew |
Wetherbee, Lockhart,
Lopez-Alegria,
Herrington; (ISS up) Bowersox, Budarin, Pettit; (ISS down) Korzun,
Whitson, Treschev |
| Orbital Insertion Altitude/Inclination |
122
nautical miles/51.6 degrees |
|
|
|
|
Shuttle
Processing Note (previous
notes) |
| Endeavour’s forward and aft closeouts continue in preparation for its upcoming launch to the International Space Station. The Manipulator Positioning Mechanism that is attached to the Remote Manipulator System was cycled and a gap was noted. Engineers will evaluate and determine the necessary steps to correct the problem. |
|
|
|
MISSION:
STS-107
-- SPACEHAB/FREESTAR
Microgravity Research Mission |
| Vehicle |
Columbia/OV-102 |
| Target Launch Date |
January 16, 2003
NET |
| Target Landing Date |
February 1, 2003 |
| Mission Duration |
16 days |
| Crew |
Husband, McCool,
Anderson, Chawla, Brown, Clark, Ramon |
| Orbital Insertion
Altitude/ Inclination |
150
nautical miles/39 degrees |
|
| |
|
Shuttle
Processing Note (previous
notes) |
| Columbia was transferred from the Vehicle Assembly Building to continue processing in preparation for its research mission now scheduled for no earlier than Jan. 16. |
|
|
|
ORBITER
MAJOR MODIFICATION PERIOD |
|
|
|
|
|
Shuttle
Processing Note (previous
notes) |
| The Orbiter Major Modification (OMM) period for Discovery is underway with radiator removal and nose landing gear retraction. Wire inspections continue and will be performed throughout the entire vehicle during the OMM. |
|
|
|