September 16, 2002

 
2002 Year at a Glance

Status Reports

August Status Reports
 
Note

This is an orbiter processing report and does not necessarily reflect the chronological order of upcoming Space Shuttle flights.  Visit http://www-pao.ksc.nasa.gov/kscpao/schedule/schedule.htm for the latest schedule of future Shuttle missions.

 

MISSION: STS-112 -- 15th ISS Flight (9A) - S1 Truss Segment 

Vehicle Atlantis/OV-104
Target Launch Date October 2, 2002 NET
Target Launch Period 2 - 6 p.m. EDT
Target Landing Date October 13, 2002
Mission Duration 11 days
Crew Ashby, Melroy, Wolf, Sellers, Magnus, Yurchikhin
Orbital Insertion Altitude/Inclination 122 nautical miles/51.6 degrees
 

Shuttle Processing Note  (previous notes)

Final preparations for Atlantis’ lift-off to the International Space Station continue in work. Last week a block was installed in the payload bay on the Manipulator Positioning Mechanism, which is attached to the Remote Manipulator System, due to a small gap. After the block was installed and final adjustments were made to the driveline linkage, the gap was eliminated.
 
Preparations are also in work for payload installation, the Terminal Countdown Demonstration Test and Helium Leak checks on the Main Propellant System, which are all scheduled for this week. Preparations are also in work for propellant loading later in the week. Tomorrow, mission managers will met at KSC for the Flight Readiness Review.
 

MISSION: STS-113 -- 16th ISS Flight (11A) - P1 Truss Segment

Vehicle Endeavour/OV-105
Target Launch Date November 10, 2002 NET
Target Landing Date November 20, 2002
Mission Duration 11 days
Crew Wetherbee, Lockhart, Lopez-Alegria, Herrington; (ISS up) Bowersox, Budarin, Pettit; (ISS down) Korzun, Whitson, Treschev 
Orbital Insertion Altitude/Inclination 122 nautical miles/51.6 degrees
 

Shuttle Processing Note  (previous notes)

Endeavour’s forward and aft closeouts continue in preparation for its upcoming launch to the International Space Station. The Manipulator Positioning Mechanism that is attached to the Remote Manipulator System was cycled and a gap was noted. Engineers will evaluate and determine the necessary steps to correct the problem.
 

MISSION: STS-107 -- SPACEHAB/FREESTAR Microgravity Research Mission

Vehicle Columbia/OV-102
Target Launch Date January 16, 2003 NET
Target Landing Date February 1, 2003
Mission Duration 16 days
Crew Husband, McCool, Anderson, Chawla, Brown, Clark, Ramon 
Orbital Insertion Altitude/ Inclination 150 nautical miles/39 degrees
 

Shuttle Processing Note  (previous notes)

Columbia was transferred from the Vehicle Assembly Building to continue processing in preparation for its research mission now scheduled for no earlier than Jan. 16.
 

ORBITER MAJOR MODIFICATION PERIOD

Vehicle Discovery/OV-103
 

Shuttle Processing Note  (previous notes)

The Orbiter Major Modification (OMM) period for Discovery is underway with radiator removal and nose landing gear retraction. Wire inspections continue and will be performed throughout the entire vehicle during the OMM.
 

The Kennedy Space Center (KSC) Newsroom offers an electronic subscription service for status reports, news releases and other notices issued from KSC. There are two possible ways to subscribe.  You may send a blank e-mail message to ksc-news_release-subscribe@kscnews.ksc.nasa.gov or follow the instructions on the Web site at http://kscnews.ksc.nasa.gov. The system will confirm the request via e-mail.

 
KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines

Page Last Revised

Page & Curator Information

09/16/2002

Curator: Kay Grinter (Kay.Grinter-1@ksc.nasa.gov) -- InDyne, Inc.
Web Development: JBOSC Web Development Team
A Service of the NASA/KSC External Relations and Business Development Directorate
JoAnn H. Morgan, Director