NASA Home Page NASA Home PageJohn F. Kennedy Space Center - NASA Facts On Line

KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines

Countdown! NASA Launch Vehicles and Facilities
PMS 018-B 
October 1991
Section 3

 

Main Engines

Previous Section

Next Section

Table  of Contents KSC Fact Sheets Next Page

Newly arrived Space Shuttle main engines, delivered by truck from Stennis Space Center in Mississippi after test firing, off-load in the Vehicle Assembly Building where the main engine workshop is located. The workshop is a low bay checkout cell that has been converted into an enclosed, environmentally controlled area.

The workshop has three engine workstands and can support main engine disassembly and reassembly, checkout and leak testing. The engines go to the Orbiter Processing Facility for installation. The workshop also supports engine removal operations and preparation of engines for shipment back to Stennis for test firing or to the manufacturer in California for refurbishment.

Main Engines

A cluster of three main engines provides the primary propulsion for the orbiter and helps to steer the Shuttle. The Vehicle Assembly Building has more than 70 lifting devices, including two 250-ton (227-metric-ton) cranes.  

 Top of Page
  

KSC Home Page Site Search FAQ's Site Survey Customer Forum NASA Centers Privacy Statement Headlines

Page Last Revised

Page & Curator Information

08/28/2002

 Curator: Kay Grinter (kay.grinter-1@ksc.nasa.gov) / InDyne, Inc. 
Web Development: JBOSC Web Development Team
A Service of the NASA/KSC External Relations and Business Development Directorate
JoAnn H. Morgan, Director