Did
You Know?
During this
hold period, the NASA Test
Director
briefs the launch team on recycle options during the remainder
of the countdown. From this point through T-31 seconds, any console
operator can request a countdown hold if a problem is detected.
After T-31 seconds, however, any unplanned hold would result in
an automatic suspension of the countdown and a recycling of the
countdown clock back to the T-20 minute mark.
|
T-20 minutes and holding...
|
|
NASA
Test Director Steve
Altemus requests
members of his team to verify that the proper software has been
loaded for the remainder of the countdown.
Pre-flight Inertial
Measurement Unit (IMU) alignment is completed and verified.
The Landing and Recovery Director verifies that the Shuttle landing
site is ready and configured for launch and that the booster recovery
ships are on station.

SRB Recovery
Ship, the Liberty Star
At
launch time, the International Space Station will be at 47.4 north
latitude and 15.87 east longitude; that puts the ISS and Expedition
Five Crew over Austria in Central Europe.
|